- Steel B500 and A500HW
- Concrete K40 XF3 and all alloying elements CE-certified.
- FI Certification
- All SJR bases found on this page are equipped with a plastic cable entry.
- SECOND STAGE CONCRETE: The mast is adjusted with adjusting screws upon installation. The mast is attached to the base by filling the hole with fresh concrete. No rubber protector.
- We reserve the right to make changes to the technical specifications.









